Linesight is working closely with this client on a phased project milestone strategy for the construction of a new data centre campus in a southern suburb of Paris, advising on the most economical sequencing options to mitigate the risk of cost overruns. This strategy includes managing a comprehensive value engineering process to optimise a complex façade design and focuses on reducing the complexity and cost of the building elements while maintaining the required functionality and quality standards.
Furthermore, with site conditions including a high water table, potential contamination, and proximity to adjacent residential areas, Linesight is actively tracking all project risk items, offering guidance on cost implications, and proposing effective mitigation strategies to address these challenges.
Data
Ongoing
Ludovic Lecoeur
Associate Director
Paris
Relevant Projects
Latest Insights
19th December 2024
Influential Leader Series – Featuring Brittany Miller, Senior Vice President of Global Development, NTT Global Data Centers
Brittany spoke to Dawn Cantrell, Vice President Americas at Linesight, where they discussed NTT’s role within the fast-changing data center sector, navigating challenges, and advice on mentorship.
Continue Reading20 November 2024
Construction Market Insights H2 2024 – Europe
20 November 2024
Construction Market Insights H2 2024 – Americas
20 November 2024
Construction Market Insights H2 2024 – APAC & GCC