20th June 2021
Linesight provided Cost Management from commencement through to completion for the construction of a three-storey Primary Care Centre, incorporating the HSE primary care teams, GP surgery and some retail units at ground floor level.
The design and build contract included a pre-cast concrete structure over three floors to accommodate the HSE facility including specialist treatment rooms and consultation areas. The facility achieved an A rated BER.
“We have worked with Linesight in the delivery of multiple Primary Care Centres throughout Ireland. In the role of Project Manager and Quantity Surveyor, the team’s management of the tendering process, elimination of risks, and fostering of a “team” mentality, has made communication and productivity on our projects seamless. They have also collaborated with us to improve our internal processes by implementing a Design & Build procurement strategy. We have been consistently impressed by Linesight’s professionalism, forward thinking and solutions focused approached, allowing us to derive maximum value from our projects.”
- Brian Gilroy, Director, Glencar Healthcare
Data
Size
status
Aidan Walsh
Director
Europe
Relevant Projects
Latest Insights
23rd October 2024
Quantity Surveyors: The Missing Piece to the US Construction Market
Seasoned construction professional talks about the current landscape of the US construction market and the need for chartered quantity surveyors.
Continue Reading